Barco BlendPRO-II Manual del operador Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 89
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
STEP 1: Projector Clock Phase Adjustment
STEP 2: Projector Horizontal and Vertical Sampling Adjustments
STEP 3: Projector-to-Projector Color Balance Adjustment
STEP 4: Projector Registration (Overlap and Geometry Adjustment)
STEP 5: Output Black Level Adjustment for Non-Overlapped Region
STEP 6: Configure BlendPRO for 1:1 Sampling (Input Clock Phase and Horiz. Position Adjustments)
STEP 7: Source-to-Source Color Balance
STEP 8: Turn on Data Doubling
STEP 9: Feathering transfer function adjustment
This is a quick reference guide. For detailed information on the BlendPRO
, please refer to the
Installation and Operating Manual supplied with your unit.
Folsom Research, Inc.
11101-A Trade Center Drive, Rancho Cordova CA 95670
(916) 859-2500
www.folsom.com
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 88 89

Comentarios a estos manuales

Sin comentarios